Waste Water Engineering The minimum diameter of sewer to be adopted is 15 cm 10 cm 25 cm 12.5 cm 15 cm 10 cm 25 cm 12.5 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level Top of smaller sewer is kept lower None of these Top of larger sewer is kept lower Tops of both the sewers are at the same level Top of smaller sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following tests is used for testing sewer pipes? Ball test Mirror test Water test All of these Ball test Mirror test Water test All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of sewage is determined with the help of None of these Potentiometer Imhoff Cone Turbid meter None of these Potentiometer Imhoff Cone Turbid meter ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 25°C 20°C 0°C 15°C 25°C 20°C 0°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP