Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 0°C 25°C 20°C 15°C 0°C 25°C 20°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for Unexpected increase in population Large scale infiltration of storm water All listed here Low estimates of the average and maximum flows Unexpected increase in population Large scale infiltration of storm water All listed here Low estimates of the average and maximum flows ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 100 upward 1 in 500 upward 1 in 100 downward 1 in 503 upward 1 in 100 upward 1 in 500 upward 1 in 100 downward 1 in 503 upward ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 12 days 2 days 14 days 7 days 12 days 2 days 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to First stage demand Initial demand Carbonaceous demand All of these First stage demand Initial demand Carbonaceous demand All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is 300 mg/l 200 mg/l 100 mg/l 400 mg/l 300 mg/l 200 mg/l 100 mg/l 400 mg/l ANSWER DOWNLOAD EXAMIANS APP