Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 20°C 25°C 0°C 15°C 20°C 25°C 0°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours 4 to 8 hours 8 to 16 hours 24 to 36 hours 16 to 24 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains Both A. and B. With beds of rocks and gravels Lined with stones Neither A. nor B. Both A. and B. With beds of rocks and gravels Lined with stones Neither A. nor B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry water flow in a combined sewer, is Inclusive of domestic and industrial sewage but excludes storm water Storm water Industrial sewage Domestic sewage Inclusive of domestic and industrial sewage but excludes storm water Storm water Industrial sewage Domestic sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 500 litres/km/cm 1500 litres/km/cm 1000 litres/km/cm 2000 litres/km/cm 500 litres/km/cm 1500 litres/km/cm 1000 litres/km/cm 2000 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is 4 3 1.5 2 4 3 1.5 2 ANSWER DOWNLOAD EXAMIANS APP