Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 0°C 20°C 15°C 25°C 0°C 20°C 15°C 25°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For treating the sewage of a large city, you will recommend Sedimentation tanks with high rate trickling filters A plant consisting of Imhoff tanks with low rate trickling filters A sedimentation tank and an activated sludge treatment plant None of these Sedimentation tanks with high rate trickling filters A plant consisting of Imhoff tanks with low rate trickling filters A sedimentation tank and an activated sludge treatment plant None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Concreting Neither A nor B Raising low lying areas by dumping Both A and B Concreting Neither A nor B Raising low lying areas by dumping Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 15 cm c/c 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c 50 cm c/c 22.5 cm c/c 30 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which of the following pumps in used to pump sewage solids with liquid sewage without clogging the pump is? Pneumatic ejector Centrifugal pump None of these Reciprocating pump Pneumatic ejector Centrifugal pump None of these Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP