Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 15°C 0°C 25°C 20°C 15°C 0°C 25°C 20°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Level Clinometer Theodolite Magnetic compass Level Clinometer Theodolite Magnetic compass ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 300 m 100 m 150 m 200 m 300 m 100 m 150 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A circular sewer section is preferred to because It provides maximum area for a given perimeter It is cheaper in construction All listed here It provides maximum hydraulic mean depth It provides maximum area for a given perimeter It is cheaper in construction All listed here It provides maximum hydraulic mean depth ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Reciprocating pump Centrifugal pump Air pressure pump Pneumatic ejector Reciprocating pump Centrifugal pump Air pressure pump Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Average demand Four times the average demand Twice the average demand Thrice the average demand Average demand Four times the average demand Twice the average demand Thrice the average demand ANSWER DOWNLOAD EXAMIANS APP