Waste Water Engineering The sewerage system consists of Lateral sewer House sewer Branch sewer All of these Lateral sewer House sewer Branch sewer All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes Flow velocity is kept 0.09 m/sec All listed here Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Lined with stones Neither A. nor B. Both A. and B. With beds of rocks and gravels Lined with stones Neither A. nor B. Both A. and B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, The baffles or tees are extended up to top level of scum The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided All listed here The baffles or tees are extended up to top level of scum The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D2/3 = 4 b2/3 D3/2 = 4 b3/2 D8/3 = 4 b8/3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 100 cm 80 cm 50 cm 90 cm 100 cm 80 cm 50 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP