Waste Water Engineering Removal of oil and grease from sewage, is known None of these Filtration Skimming Screening None of these Filtration Skimming Screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Carbon dioxide Oxygen Hydrogen sulphide Methane Carbon dioxide Oxygen Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage discharge in a detritus tank of a treatment plant is 576 litres/sec with flow velocity of 0.2 m/sec. If the ratio of width to depth is 2, the depth is 100 cm 110 cm 120 cm 150 cm 100 cm 110 cm 120 cm 150 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of the diameter of a circular section and the side of a square section hydraulically equivalent, is 1.075 1.095 1.065 1.085 1.075 1.095 1.065 1.085 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 75 to 80% 70 to 75% 65 to 70% 0.85 75 to 80% 70 to 75% 65 to 70% 0.85 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 2 hours 1 hour 1 hour and 30 minutes 30 minutes 2 hours 1 hour 1 hour and 30 minutes 30 minutes ANSWER DOWNLOAD EXAMIANS APP