Waste Water Engineering A nuisance is experienced in diluting water if dilution factor is less than 40 20 60 100 40 20 60 100 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in None of these Lakes Rivers Seas None of these Lakes Rivers Seas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Fertilizer Building material Base material for paints Chemical for lowering B.O.D. Fertilizer Building material Base material for paints Chemical for lowering B.O.D. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes The men entering the manhole should be advised to smoke in the sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the grit in grit chambers is 4.5 million litres per day, its cleaning is done Mechanically Electrically Manually Hydraulically Mechanically Electrically Manually Hydraulically ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for The flow of sewage to fill the tank None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length The flow of sewage to fill the tank None of these A particle to travel from top surface to bottom sludge zone A particle to travel along its length ANSWER DOWNLOAD EXAMIANS APP