Waste Water Engineering Sewer pipes need be checked for Both A and B Minimum flow None of these Maximum flow Both A and B Minimum flow None of these Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 25 to 50 m 150 m to 300 m 100 m to 150 m 50 m to 100 m 25 to 50 m 150 m to 300 m 100 m to 150 m 50 m to 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is 413.5 cm/sec 213.5 cm/sec 500 cm/sec 313.5 cm/sec 413.5 cm/sec 213.5 cm/sec 500 cm/sec 313.5 cm/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, All of these The velocity of flow is restricted to 0.30 m/minute The shape is rectangular Detention period is 2 hours All of these The velocity of flow is restricted to 0.30 m/minute The shape is rectangular Detention period is 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering R.M.O. expenses include Running expenses Maintenance expenses All of these Operation expenses Running expenses Maintenance expenses All of these Operation expenses ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 90 days 15 days 60 days 30 days 90 days 15 days 60 days 30 days ANSWER DOWNLOAD EXAMIANS APP