Waste Water Engineering Sewer pipes need be checked for Both A and B Minimum flow None of these Maximum flow Both A and B Minimum flow None of these Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of fresh sewage is usually Less than 7 Equal to zero Equal to 7 More than 7 Less than 7 Equal to zero Equal to 7 More than 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 20 m 75 m 45 m 30 m 20 m 75 m 45 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for All listed here Unexpected increase in population Low estimates of the average and maximum flows Large scale infiltration of storm water All listed here Unexpected increase in population Low estimates of the average and maximum flows Large scale infiltration of storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Irrigation Oxidation Purification Dilution Irrigation Oxidation Purification Dilution ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hydraulic mean radius is Mean radius of sewer Mean of radii in a pipe line of varying cross -sections Cross-sectional area/wetted perimeter Difference in heads between two points in circular pipes Mean radius of sewer Mean of radii in a pipe line of varying cross -sections Cross-sectional area/wetted perimeter Difference in heads between two points in circular pipes ANSWER DOWNLOAD EXAMIANS APP