Waste Water Engineering Sewer pipes need be checked for Maximum flow Minimum flow None of these Both A and B Maximum flow Minimum flow None of these Both A and B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewers, inverted siphon is provided for One pipe Two pipes Four pipes Three pipes One pipe Two pipes Four pipes Three pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm The baffles or tees are extended up to top level of scum All listed here Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm The baffles or tees are extended up to top level of scum All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is 25 cm 50 cm 20 cm 40 cm 25 cm 50 cm 20 cm 40 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrites are formed Ammonia is formed Nitrates are formed Carbondioxide is formed Nitrites are formed Ammonia is formed Nitrates are formed Carbondioxide is formed ANSWER DOWNLOAD EXAMIANS APP