Waste Water Engineering Sewer pipes need be checked for Maximum flow None of these Both A and B Minimum flow Maximum flow None of these Both A and B Minimum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead acetate test in sewer manhole is done to test the presence of Hydrogen sulphide Diesel vapours Methane gas Carbondioxide gas Hydrogen sulphide Diesel vapours Methane gas Carbondioxide gas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Lateral sewer House sewer Branch sewer Sewer outfall Lateral sewer House sewer Branch sewer Sewer outfall ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours The shape is rectangular All of these The velocity of flow is restricted to 0.30 m/minute Detention period is 2 hours The shape is rectangular All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The small sewers are cleaned by Wooden pills Flushing Cane rodding None of these Wooden pills Flushing Cane rodding None of these ANSWER DOWNLOAD EXAMIANS APP