Waste Water Engineering Sewer pipes need be checked for Minimum flow None of these Both A and B Maximum flow Minimum flow None of these Both A and B Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In circular sewers if depth of flow is 0.2 times the full depth, the nominal gradient, Is doubled Is not enough Is trebled Is only provided Is doubled Is not enough Is trebled Is only provided ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The porosity of sediments in sewer pipes, is usually taken as 0.011 0.013 0.01 0.012 0.011 0.013 0.01 0.012 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Sewer outfall Branch sewer House sewer Lateral sewer Sewer outfall Branch sewer House sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering No treatment of the sewage is given if dilution factor is Less than 150 Between 150 to 200 More than 500 Between 200 to 300 Less than 150 Between 150 to 200 More than 500 Between 200 to 300 ANSWER DOWNLOAD EXAMIANS APP