Waste Water Engineering Sewer pipes need be checked for Minimum flow Both A and B Maximum flow None of these Minimum flow Both A and B Maximum flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is 25 cm 50 cm 20 cm 40 cm 25 cm 50 cm 20 cm 40 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Water content of sewage is about 0.95 0.99 0.999 0.9 0.95 0.99 0.999 0.9 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is 0.05 m/sec None of these 0.09 m/sec 1.25 m/sec 0.05 m/sec None of these 0.09 m/sec 1.25 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A jar An Imhoff cone A breaker A test tube A jar An Imhoff cone A breaker A test tube ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known House sewer Sewer outfall Branch sewer Lateral sewer House sewer Sewer outfall Branch sewer Lateral sewer ANSWER DOWNLOAD EXAMIANS APP