Waste Water Engineering The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is 216 cu.m 208 cu.m 204 cu.m 212 cu.m 216 cu.m 208 cu.m 204 cu.m 212 cu.m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in None of these Rivers Seas Lakes None of these Rivers Seas Lakes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43894 43832 43833 43834 43894 43832 43833 43834 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen Carbon dioxide Ammonia All listed here Hydrogen Carbon dioxide Ammonia All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Pneumatic ejector Air pressure pump Centrifugal pump Reciprocating pump Pneumatic ejector Air pressure pump Centrifugal pump Reciprocating pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called Sewage Sullage None of these Liquid waste Sewage Sullage None of these Liquid waste ANSWER DOWNLOAD EXAMIANS APP