Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 5 1 in 10 1 in 15 1 in 20 1 in 5 1 in 10 1 in 15 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula Ps = 900/(t + 60) the maximum run off is 0.15 cumec 0.10 cumec 0.20 cumec 0.12 cumec 0.15 cumec 0.10 cumec 0.20 cumec 0.12 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross section of sewers in a separate sewerage system is Parabolic Rectangular New egged Circular Parabolic Rectangular New egged Circular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For detecting the nitrites in the sewage, the matching colour may be developed by adding Sulphuric acid and napthamine Phenol-di -sulphuric acid potassium hydroxide None of these Potassium permanganate Sulphuric acid and napthamine Phenol-di -sulphuric acid potassium hydroxide None of these Potassium permanganate ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 3 minutes 5 minutes 2 minutes 1 minute 3 minutes 5 minutes 2 minutes 1 minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In areas where rainy season is limited to a few months, the type of sewerage system recommended is Partially separate system None of these Separate system Combined system Partially separate system None of these Separate system Combined system ANSWER DOWNLOAD EXAMIANS APP