Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 10 1 in 15 1 in 5 1 in 20 1 in 10 1 in 15 1 in 5 1 in 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for All listed here Low estimates of the average and maximum flows Unexpected increase in population Large scale infiltration of storm water All listed here Low estimates of the average and maximum flows Unexpected increase in population Large scale infiltration of storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 0.25 10 2 5 0.25 10 2 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed Equal to the rate of water supply Less than the rate of water supply At 150 litres per capita More than the rate of water supply Equal to the rate of water supply Less than the rate of water supply At 150 litres per capita More than the rate of water supply ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In normal conditions, the period for sludge digestion, is 20 days 60 days 10 days 30 days 20 days 60 days 10 days 30 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, The bottom is silted Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is scoured The bottom is silted Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is scoured ANSWER DOWNLOAD EXAMIANS APP