Waste Water Engineering The bottom of the sewage inlet chamber of septic tanks, is provided an outward slope 1 in 5 1 in 20 1 in 10 1 in 15 1 in 5 1 in 20 1 in 10 1 in 15 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 503 upward 1 in 100 upward 1 in 500 upward 1 in 100 downward 1 in 503 upward 1 in 100 upward 1 in 500 upward 1 in 100 downward ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas evolved in sewers is Carbondioxide All of these Hydrogen sulphide Methane Carbondioxide All of these Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 100 cm 90 cm 50 cm 80 cm 100 cm 90 cm 50 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 14 days 7 days 12 days 2 days 14 days 7 days 12 days 2 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be > 1.5 m 1.2 m 0.9 cm 1.5 m > 1.5 m 1.2 m 0.9 cm 1.5 m ANSWER DOWNLOAD EXAMIANS APP