• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Waste Water Engineering

Waste Water Engineering
Pick up the incorrect size of stone ware sewers

82.5 cm
None of these
67.5 cm
52.5 cm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The detention period for plain sedimentation water tanks, is usually

4 to 8 hours
24 to 36 hours
8 to 16 hours
16 to 24 hours

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The ratio of design discharge to the surface area of a sedimentation tank is called

Overflow velocity
Surface loading
Overflow rate
All of these

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for

All of these
Under estimates of maximum and average flows
Unexpected increase in the population
Unexpected large scale infiltration of stream water

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is

1 in 120
None of these
1 in 60
1 in 100

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Sludge banks are formed if sewage is disposed of in

Seas
Lakes
Rivers
None of these

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑