Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to

Carbonaceous demand
First stage demand
All of these
Initial demand

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In a grit chamber of a sewage treatment plant,

Flow velocity 0.15 m to 0.3 m/sec is kept
Depth of 0.9 m to 1.20 m is kept
One minute of detention period is kept
All of these

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In olden days the type of section adopted in trunk and out fall sewers was

Circular shaped
Egg shaped
Horse shoe shaped
Parabolic shaped

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Chlorination of water is done for the removal of

Bacterias
Sediments
Hardness
Suspended solids

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In circular sewers if depth of flow is 0.2 times the full depth, the nominal gradient,

Is doubled
Is not enough
Is only provided
Is trebled

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The disintegrating pump in which solid matter is broken up before passing out, is

Pneumatic ejector
None of these
Centrifugal pump
Reciprocating pump

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑