Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Clinometer Theodolite Magnetic compass Level Clinometer Theodolite Magnetic compass Level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is 200 ppm 225 ppm 250 ppm None of these 200 ppm 225 ppm 250 ppm None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the side of a square sewer is 1000 mm, the diameter of a hydraulically equivalent circular section, is 1065 mm 1095 mm 1075 mm 1045 mm 1065 mm 1095 mm 1075 mm 1045 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage treatment in septic tanks is due to Parasitic decomposition Aerobic decomposition Anaerobic decomposition None of these Parasitic decomposition Aerobic decomposition Anaerobic decomposition None of these ANSWER DOWNLOAD EXAMIANS APP