Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Are available in size Stoneware sewers 10 cm 20 cm 15 cm All of these 10 cm 20 cm 15 cm All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from City Out-fall Any point Tail end City Out-fall Any point Tail end ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q d (0.785d + 0.011H)/Q d (0.022d + 0.085H)/Q d (0.285d + 0.011H)/Q d² (0.011d + 0.785H)/Q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A test tube A breaker A jar An Imhoff cone A test tube A breaker A jar An Imhoff cone ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Chlorination of water is done for the removal of Bacterias Hardness Sediments Suspended solids Bacterias Hardness Sediments Suspended solids ANSWER DOWNLOAD EXAMIANS APP