Waste Water Engineering In detritus tanks, All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec All listed here Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer pipe contains 1 mm sand particles of specific gravity 2.65 and 5 mm organic particles of specific gravity 1.2, the minimum velocity required for removing the sewerage, is 0.30 m/sec 0.40 m/sec 0.45 m/sec 0.35 m/sec 0.30 m/sec 0.40 m/sec 0.45 m/sec 0.35 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewers, inverted siphon is provided for One pipe Four pipes Three pipes Two pipes One pipe Four pipes Three pipes Two pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross-section of sewers in a combined sewerage system is Rectangular Parabolic New egged Circular Rectangular Parabolic New egged Circular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, decomposition of organic bacteria, is done by Anaerobic bacteria Both types of bacterias None of these Aerobic bacteria Anaerobic bacteria Both types of bacterias None of these Aerobic bacteria ANSWER DOWNLOAD EXAMIANS APP