Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 8 to 16 hours 16 to 24 hours 24 to 36 hours 4 to 8 hours 8 to 16 hours 16 to 24 hours 24 to 36 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A circular sewer section is preferred to because It is cheaper in construction It provides maximum area for a given perimeter It provides maximum hydraulic mean depth All listed here It is cheaper in construction It provides maximum area for a given perimeter It provides maximum hydraulic mean depth All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If D is the diameter of a circular sewer and D’ is the top horizontal diameter of an equivalent egg shaped section, the relationship which holds good, is D’ = 0.64 D D’ = 0.94 D D’ = 0.74 D D’ = 0.84 D D’ = 0.64 D D’ = 0.94 D D’ = 0.74 D D’ = 0.84 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen Ammonia Carbon dioxide All listed here Hydrogen Ammonia Carbon dioxide All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rational formula for peak drainage discharge, was evolved by Fruhling All of these Kuichling Lloyd David Fruhling All of these Kuichling Lloyd David ANSWER DOWNLOAD EXAMIANS APP