Waste Water Engineering A drop manhole is provided if A lamp is inserted to check obstruction A sewer drops from a height A branch sewer joins the main sewer at higher level None of these A lamp is inserted to check obstruction A sewer drops from a height A branch sewer joins the main sewer at higher level None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas which may cause explosion in sewers, is Carbondioxide Carbon monoxide Methane Ammonia Carbondioxide Carbon monoxide Methane Ammonia ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by All listed here Pressure sewers are designed to be safe in tension The internal pressure if any, causes tensile stress in the pipe material The sewage when running full from inside, is called internal pressure All listed here Pressure sewers are designed to be safe in tension The internal pressure if any, causes tensile stress in the pipe material The sewage when running full from inside, is called internal pressure ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed 3 1.5 2 2.5 3 1.5 2 2.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 500 litres/km/cm 2000 litres/km/cm 1000 litres/km/cm 1500 litres/km/cm 500 litres/km/cm 2000 litres/km/cm 1000 litres/km/cm 1500 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 6 hours 8 hours 2 hours 4 hours 6 hours 8 hours 2 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP