Waste Water Engineering In a sludge tank, the gas mainly produced, is Oxygen Nitrogen Hydrogen Carbon dioxide Oxygen Nitrogen Hydrogen Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Invert level of a branch sewer is more than 60 cm that of the main sewer Two sewer lines intersect Ordinary manhole cannot be built Sewer line runs along a main road Invert level of a branch sewer is more than 60 cm that of the main sewer Two sewer lines intersect Ordinary manhole cannot be built Sewer line runs along a main road ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 2000 litres/km/cm 1500 litres/km/cm 500 litres/km/cm 1000 litres/km/cm 2000 litres/km/cm 1500 litres/km/cm 500 litres/km/cm 1000 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead caulked joints are used for laying Earthenware pipes G.I. pipes Stone ware pipes I. pipes Earthenware pipes G.I. pipes Stone ware pipes I. pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In 1000 kg of sewage, the total solids approximate 5 kg to 7.5 kg 1 kg to 2.0 kg 7.5 kg to 10 kg 0.5 to 1.0 kg 5 kg to 7.5 kg 1 kg to 2.0 kg 7.5 kg to 10 kg 0.5 to 1.0 kg ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Carbondioxide is formed Nitrates are formed Nitrites are formed Ammonia is formed Carbondioxide is formed Nitrates are formed Nitrites are formed Ammonia is formed ANSWER DOWNLOAD EXAMIANS APP