Waste Water Engineering The sludge does not contain waste water from Toilets Wash basins Bath rooms Kitchen sinks Toilets Wash basins Bath rooms Kitchen sinks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 503 upward 1 in 100 upward 1 in 500 upward 1 in 100 downward 1 in 503 upward 1 in 100 upward 1 in 500 upward 1 in 100 downward ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering An inverted siphon is designed generally for Three pipes Four pipes One pipe Two pipes Three pipes Four pipes One pipe Two pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is 1.76 m 0.88 m 0.68 m 1.36 m 1.76 m 0.88 m 0.68 m 1.36 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 5 years 3.5 years 3 years 4 years 5 years 3.5 years 3 years 4 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is 30 m 75 m 45 m 20 m 30 m 75 m 45 m 20 m ANSWER DOWNLOAD EXAMIANS APP