Waste Water Engineering Drop manholes at the junctions of sewer lines, are provided if Two sewer lines intersect Sewer line runs along a main road Ordinary manhole cannot be built Invert level of a branch sewer is more than 60 cm that of the main sewer Two sewer lines intersect Sewer line runs along a main road Ordinary manhole cannot be built Invert level of a branch sewer is more than 60 cm that of the main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called Depressed sewer Sag pipe Inverted syphon all of these Depressed sewer Sag pipe Inverted syphon all of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of sewage is determined with the help of Turbid meter Potentiometer Imhoff Cone None of these Turbid meter Potentiometer Imhoff Cone None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here Must be of adequate size to avoid over flow Must flow under gravity ½ to ¾ full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering depends upon The Chezy’s constant C in the formula V = C All listed here Size of the sewer Shape of the sewer Roughness of sewer surface All listed here Size of the sewer Shape of the sewer Roughness of sewer surface ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of New Egg shaped sewer section, is 1.425 D 1.625 D 1.350 D 1.250 D 1.425 D 1.625 D 1.350 D 1.250 D ANSWER DOWNLOAD EXAMIANS APP