Waste Water Engineering Dried sewage after treatment is used as Chemical for lowering B.O.D. Building material Fertilizer Base material for paints Chemical for lowering B.O.D. Building material Fertilizer Base material for paints ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Twice the average demand Average demand Thrice the average demand Four times the average demand Twice the average demand Average demand Thrice the average demand Four times the average demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 100 mg/l 200 mg/l 400 mg/l 300 mg/l 100 mg/l 200 mg/l 400 mg/l 300 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 30 litres/person/year 25 litres/person/month 30 litres/person/month 25 litres/person/year 30 litres/person/year 25 litres/person/month 30 litres/person/month 25 litres/person/year ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Girt and sand are removed by girt chambers All listed here Floating materials are removed by screening Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers All listed here Floating materials are removed by screening Oil and grease are removed from skimming tanks ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 10000 1000 100 5000 10000 1000 100 5000 ANSWER DOWNLOAD EXAMIANS APP