Waste Water Engineering Dried sewage after treatment is used as Fertilizer Building material Base material for paints Chemical for lowering B.O.D. Fertilizer Building material Base material for paints Chemical for lowering B.O.D. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Rate of flow of sewage is generally assumed More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply At 150 litres per capita More than the rate of water supply Less than the rate of water supply Equal to the rate of water supply At 150 litres per capita ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Should be sunk by 50 cm Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Need not be sunk Should be sunk by 50 cm Should be sunk by 20 cm Should be kept 20 cm above the adjacent portion Need not be sunk ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Kitchen sinks Wash basins Bath rooms Toilets Kitchen sinks Wash basins Bath rooms Toilets ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Both A and B Concreting Raising low lying areas by dumping Neither A nor B Both A and B Concreting Raising low lying areas by dumping Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is 40 cm 50 cm 25 cm 20 cm 40 cm 50 cm 25 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP