Waste Water Engineering Dried sewage after treatment is used as Fertilizer Building material Base material for paints Chemical for lowering B.O.D. Fertilizer Building material Base material for paints Chemical for lowering B.O.D. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by R.C.C. Glazed stonewares P.C.C. Cast iron R.C.C. Glazed stonewares P.C.C. Cast iron ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A cylindrical ejector having its height 2 m fills after every 10 minutes with a peak sewage discharge of 0.0157 cumec. The diameter of the ejector chamber, is 2.50 m 2.30 m 2.45 m 2.40 m 2.50 m 2.30 m 2.45 m 2.40 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes Organic and inorganic materials are separated All listed here Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Lined with stones Both A. and B. Neither A. nor B. With beds of rocks and gravels Lined with stones Both A. and B. Neither A. nor B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is 204 cu.m 212 cu.m 208 cu.m 216 cu.m 204 cu.m 212 cu.m 208 cu.m 216 cu.m ANSWER DOWNLOAD EXAMIANS APP