Process Equipment and Plant Design Removable connection of tubes to tube sheet is called Ferrule Socket Saddle Nipple Ferrule Socket Saddle Nipple ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Length to diameter ratio of most rotary driers is in the range of 10 to 20 4 to 10 1 to 2 20 to 30 10 to 20 4 to 10 1 to 2 20 to 30 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multipass shell and tube heat exchanger, the shell side cross flow area does not depend upon Clearance Baffle spacing None of these Pitch Clearance Baffle spacing None of these Pitch ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In packed absorption tower, onset of flooding usually occurs at a pressure drop of about __________ mm of water column per metre height of packing. 25-50 50-75 750-1000 200-250 25-50 50-75 750-1000 200-250 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Commercial packed scrubbers are normally designed for a pressure drop range of __________ mm water coloumn per metre of packed height. 43929 88-105 17-34 52-68 43929 88-105 17-34 52-68 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Hold up of material in a operating rotary drier is in the range of 0.5 to 0.8 0.05 to 0.15 0.8 to 0.9 0.25 to 0.50 0.5 to 0.8 0.05 to 0.15 0.8 to 0.9 0.25 to 0.50 ANSWER DOWNLOAD EXAMIANS APP