Process Equipment and Plant Design The safe height (h) to diameter (d) ratio (i.e., h/d) for liquid/petro fuel storage tank of capacity more than 45 kilolitres is less than 3 3.5 2 1 3 3.5 2 1 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 3 1.5 7 5 3 1.5 7 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. All multipass 1-1 cocurrent All of these Double pipe All multipass 1-1 cocurrent All of these Double pipe ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ dished head is the strongest of all. Torispherical None of these Elliptical Hemispherical Torispherical None of these Elliptical Hemispherical ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In most of the shell and tube heat exchangers, the tube pitch is generally __________ the tube diameter. 2.5 times 1.25-1.50 times Less than One-fourth of 2.5 times 1.25-1.50 times Less than One-fourth of ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Lessing ring is formed by the addition of a partition across the centre of a raschig ring, which results in an area increase of about __________ percent. 35 55 5 20 35 55 5 20 ANSWER DOWNLOAD EXAMIANS APP