Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 20 30 10 5 20 30 10 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Smaller sized packings are generally dumped to the packed columns, and the large ones of size greater than __________ mm are stacked individually, which provides better control over bed porosity and offers lower gas pressure drop. 75 50 150 25 75 50 150 25 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Friction factor for turbulent flow in a new pipe is given by f = 16/NRe f = 0.22 NRe0.05 f = 25/NRe f = 0.04/NRe0.16 f = 16/NRe f = 0.22 NRe0.05 f = 25/NRe f = 0.04/NRe0.16 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Thin spherical shells subjected to internal pressure, develop __________ stresses. Both A & B Circumferential Radial Neither A nor B Both A & B Circumferential Radial Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design 1.2 to 3.8 cms is the value of the Downcomer liquid seal in case of a balanced tray design Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) All of these Skirt clearance for bubble caps Downcomer liquid seal in case of a balanced tray design Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) All of these Skirt clearance for bubble caps ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Commercial packed scrubbers are normally designed for a pressure drop range of __________ mm water coloumn per metre of packed height. 17-34 43929 88-105 52-68 17-34 43929 88-105 52-68 ANSWER DOWNLOAD EXAMIANS APP