Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 10 30 20 5 10 30 20 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In packed absorption tower, onset of flooding usually occurs at a pressure drop of about __________ mm of water column per metre height of packing. 200-250 25-50 750-1000 50-75 200-250 25-50 750-1000 50-75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of bubble cap distillation column of diameter greater than 1.2 metres, the cap diameter is roughly about __________ cms. 30 20 10 35 30 20 10 35 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Wind load consideration in the design of a support can be neglected, when the vessel is Tall (say 30 metres), but is full of liquid None of these Short (< 2 m) and housed indoor Tall but empty Tall (say 30 metres), but is full of liquid None of these Short (< 2 m) and housed indoor Tall but empty ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a pressure vessel containing multiple openings of various dimensions at different parts, stress concentration at the edges of the opening is maximum which becomes negligibly small beyond the area covered by __________ times the hole diameter. Five Twenty Ten Two Five Twenty Ten Two ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Baffles are provided in a shell and tube heat exchanger to increase the turbulence and velocity of the shell side fluid. Which of the following shaped baffles does not fall in the category of transverse baffle? Disk type baffle Flat plate extending across the wall Helical type baffle Segmental baffle Disk type baffle Flat plate extending across the wall Helical type baffle Segmental baffle ANSWER DOWNLOAD EXAMIANS APP