Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 20 10 5 30 20 10 5 30 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap plate column is Used only for distillation, not for absorption A continuous contactor A finite stage contactor A differential stage contactor Used only for distillation, not for absorption A continuous contactor A finite stage contactor A differential stage contactor ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 10 to 15 5 to 10 2.5 to 4.0 0.5 to 1.5 10 to 15 5 to 10 2.5 to 4.0 0.5 to 1.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design With increase in pressure drop (for a given particle size), the dust collection efficiency of a cyclone separator will Remain unaffected Increase Decrease Increase or decrease depending on the nature of the dust Remain unaffected Increase Decrease Increase or decrease depending on the nature of the dust ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum baffle height should be 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pressure drop (Δp) and the superficial gas mass velocity (G) in case of packed absorption tower operating in the preloading range are related as Δp = 1/G0.6 Δp = G2 Δp = G Δp = G0.5 Δp = 1/G0.6 Δp = G2 Δp = G Δp = G0.5 ANSWER DOWNLOAD EXAMIANS APP