Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 30 20 5 10 30 20 5 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An adequate clearance between the tray and the shell wall of a distillation column is provided to Avoid back-trapping Drain the liquid from the tray when the unit is not in operation Allow for thermal expansion and facilitate installation None of these Avoid back-trapping Drain the liquid from the tray when the unit is not in operation Allow for thermal expansion and facilitate installation None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Diameter of the seive tray column is determined by the Upper limit of the vapour velocity Height of the plate spacing Hole diameter of the seive tray Lower limit of vapour velocity Upper limit of the vapour velocity Height of the plate spacing Hole diameter of the seive tray Lower limit of vapour velocity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In inclined long tube vertical evaporators, the tubes are inclined at an angle of 15° 60° 90° 45° 15° 60° 90° 45° ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following factors affect the pressure drop in a co-current gas-liquid absorption packed tower? Size, shape, orientation and surface of the packing particles Density and viscosity of fluids Fluid flow rates All of these Size, shape, orientation and surface of the packing particles Density and viscosity of fluids Fluid flow rates All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a heat exchanger, shell side fluid velocity can be changed by changing the tube Pitch Layout Both A & B Neither A nor B Pitch Layout Both A & B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP