Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 10 5 30 20 10 5 30 20 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid gradient over the tray results due to the Large plate spacing Resistance offered to flow of liquids by caps & risers and the flow of gas Large reflux ratio Low gas velocity Large plate spacing Resistance offered to flow of liquids by caps & risers and the flow of gas Large reflux ratio Low gas velocity ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In packed towers provided with saddle packing, liquid redistributors are positioned at every __________ times column diameter or 6 metres whichever is less. 43864 43959 44119 20-25 43864 43959 44119 20-25 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ tower is the most suitable gas-liquid contacting device involving highly corrosive fluids. None of these Sieve plate Packed Bubble cap plate None of these Sieve plate Packed Bubble cap plate ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 0.5 to 1.5 2.5 to 4.0 10 to 15 5 to 10 0.5 to 1.5 2.5 to 4.0 10 to 15 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Generally, as the length of the liquid path on a tray is increased beyond 5 ft, the overall column efficiency May increase or decrease depending upon the plate spacing Decreases Increases Remains same May increase or decrease depending upon the plate spacing Decreases Increases Remains same ANSWER DOWNLOAD EXAMIANS APP