Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 20 30 5 10 20 30 5 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In perforated plate towers, the Hole sizes may be around 1/8" or 3/16" Total hole area may be around 6 to 15% of tower cross-sectional area Pressure drop is less compared is similar bubble cap towers All of these Hole sizes may be around 1/8" or 3/16" Total hole area may be around 6 to 15% of tower cross-sectional area Pressure drop is less compared is similar bubble cap towers All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Tube wall thickness depends on the cor-rosiveness of the fluids and their operating pressure & temperature and is specified by Birmingham wire gauge (B.W.G)-a number which varies from 8 to 18 with the numbers 14 and 16 being more commonly used. Outside diameter of tubes varies from about 15 to 50 mm; however a tube of less than __________ mm outside diameter is generally not recommended for fouling fluids. 38 16 28 19 38 16 28 19 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In the agitators, the power required will be changed with the increase of diameter of agitator (D) as D² D D⁹ D⁵ D² D D⁹ D⁵ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The shell side pressure drop in a shell and tube heat exchanger is maximum for __________ baffle. Disk and ring Independent of the type of Segmental Orifice Disk and ring Independent of the type of Segmental Orifice ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pressure drop per tray in the atmospheric distillation column is about __________ psi. 43833 0.07 - 0.12 0.5 - 1.0 0.01 - 0.5 43833 0.07 - 0.12 0.5 - 1.0 0.01 - 0.5 ANSWER DOWNLOAD EXAMIANS APP