Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 5 10 30 20 5 10 30 20 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The thickness of segmental baffles (25 -35% cut truncated plates usually) is generally __________ the tube wall thickness. Half Twice Four times Equal to Half Twice Four times Equal to ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing. 20-40 1000-1500 100-150 43835 20-40 1000-1500 100-150 43835 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of a long tube vertical evaporator. Tube dia is 3-6 cms, while tube length in 3-6 metres Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these Tube dia is 3-6 cms, while tube length in 3-6 metres Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Bubble cap diameter used for the distillation column having diameter ranging from 1.5 to 4.5 metres is about __________ mm. 100 150 10 50 100 150 10 50 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Correct use of 'factor of safety' is very important in equipment design. It is defined as the ratio of the None of these Working stress to ultimate stress Ultimate stress to breaking stress Ultimate stress to working stress None of these Working stress to ultimate stress Ultimate stress to breaking stress Ultimate stress to working stress ANSWER DOWNLOAD EXAMIANS APP