Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 10 20 5 30 10 20 5 30 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The thickness of segmental baffles (25 -35% cut truncated plates usually) is generally __________ the tube wall thickness. Equal to Four times Twice Half Equal to Four times Twice Half ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Smaller sized packings are generally dumped to the packed columns, and the large ones of size greater than __________ mm are stacked individually, which provides better control over bed porosity and offers lower gas pressure drop. 25 50 150 75 25 50 150 75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A high vapour velocity is required for high plate efficiency in a seive plate coloumn. The satisfactory value of operating vapor velocity for design purpose in seive plate column is about __________ percent of the flooding velocity. 45 80 60 95 45 80 60 95 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The necessary wall thickness for a metallic storage vessel is a function of the Ultimate tensile strength (or yield point) of the material and operating temperature All of these Diameter of the vessel Operating pressure and welding/joint efficiency Ultimate tensile strength (or yield point) of the material and operating temperature All of these Diameter of the vessel Operating pressure and welding/joint efficiency ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In common bubble cap distillation column design practice, riser area is approximately equal to (where, Aa = Annular passage area, and Sa = Slot area) Sa = 1.5 Aa Aa = 1.5 Sa 1.2 Aa = 1.2 Sa Aa = Sa Sa = 1.5 Aa Aa = 1.5 Sa 1.2 Aa = 1.2 Sa Aa = Sa ANSWER DOWNLOAD EXAMIANS APP