Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are only (i) (i)and(ii) (ii) and (iii) (i) and (iii) only (i) (i)and(ii) (ii) and (iii) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To maintain the two tongue rails at the exact distance To permit lateral movement of the tongue rail To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To maintain the two tongue rails at the exact distance To permit lateral movement of the tongue rail To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in Meter Gauge Broad Gauge Narrow Gauge both (a) and (b) Meter Gauge Broad Gauge Narrow Gauge both (a) and (b) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 28.49 m 7.45 m 14.24 m 21.04 m 28.49 m 7.45 m 14.24 m 21.04 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at nose of crossing None of these both (A) and (B) toe of the switch nose of crossing None of these both (A) and (B) toe of the switch ANSWER DOWNLOAD EXAMIANS APP