Railway Engineering The following tests are conducted for rails:i) falling weight testii) tensile testiii) hammer testThe compulsory tests are only (i) (i)and(ii) (ii) and (iii) (i) and (iii) only (i) (i)and(ii) (ii) and (iii) (i) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Stretcher bar is provided To ensure exact gauge at the toe of the switch as well as the nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing To ensure exact gauge at the toe of the switch as well as the nose of crossing To permit lateral movement of the tongue rail To maintain the two tongue rails at the exact distance To prevent any vertical movement between the wing rail and nose of crossing ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering 52 kg rails are mostly used in Broad Gauge Meter Gauge both (a) and (b) Narrow Gauge Broad Gauge Meter Gauge both (a) and (b) Narrow Gauge ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering What will be the curve lead for a 1 in 8.5 turnout taking off from a straight broad gauge track? 21.04 m 28.49 m 7.45 m 14.24 m 21.04 m 28.49 m 7.45 m 14.24 m ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering To ensure exact gauge, the gauge tie plates are provided at None of these both (A) and (B) nose of crossing toe of the switch None of these both (A) and (B) nose of crossing toe of the switch ANSWER DOWNLOAD EXAMIANS APP