Power Systems Which of the following is low specific speed turbine? Pelton Kaplan Francis None of these Pelton Kaplan Francis None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems For variable heads of near about but less than 30 meters, which type of turbine is used in hydro power station? None of these Francis Pelton Kaplan None of these Francis Pelton Kaplan ANSWER DOWNLOAD EXAMIANS APP
Power Systems More efficient plants are used as base load plant None of these both 1 and 2 peak load plant base load plant None of these both 1 and 2 peak load plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The method of neutral grounding affects the negative sequence network All of these positive sequence network zero sequence network negative sequence network All of these positive sequence network zero sequence network ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the value of a729, where "a" is the operator α 1 α² 0 α 1 α² 0 ANSWER DOWNLOAD EXAMIANS APP