Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 95.5 105.2 85.5 102.5 95.5 105.2 85.5 102.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Incremental cost of two generators Ic1 = 0.2 P1+60, Ic2 = 0.3 P2+40 and the ratings of the generator are 150 and 250 MW. Find the load sharing of each generator for a load of 200 MW? P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW P1 = 120 MW, P2 = 80 MW P1 = 100 MW, P2 = 100 MW P1 = 80 MW, P2 = 120 MW P1 = 60 MW, P2 = 140 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 250 450 500 900 250 450 500 900 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power system consists of 300 buses out of which 20 buses are generator buses, 25 buses are the ones with reactive power support buses and 15 buses are ones with fixed shunt capacitors. All the other buses are load buses. It is proposed to perform a load flow analysis for the system using Newton-Raphson Jacobian matrix is 554×554 540×540 555×555 553×553 554×554 540×540 555×555 553×553 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? Unreliable convergence Slow convergence A good initial guess for voltages is essential for convergence Choice of slack bus affects the convergence Unreliable convergence Slow convergence A good initial guess for voltages is essential for convergence Choice of slack bus affects the convergence ANSWER DOWNLOAD EXAMIANS APP