Power Systems The Gauss Seidel load flow method has following disadvantages. Which of the following statement is wrong? A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence A good initial guess for voltages is essential for convergence Unreliable convergence Slow convergence Choice of slack bus affects the convergence ANSWER DOWNLOAD EXAMIANS APP
Power Systems Transmission line has a length of 300 km, operating at sending end voltage Vs = 1 pu, find the receiving end voltage(Vr) at no load? 0.98 pu 0.098 pu 1 pu 1.098 pu 0.98 pu 0.098 pu 1 pu 1.098 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The internal flux linkage due to internal flux of a conductor is I/4*10-7 wb-T/m I/6*10-7 wb-T/m All of these I/2*10-7 wb-T/m I/4*10-7 wb-T/m I/6*10-7 wb-T/m All of these I/2*10-7 wb-T/m ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 20 MVA generator has inertia constant of 0.5 pu. Find new value for 50 MVA base? 0.1 pu 0.4 pu 0.2 pu 0.5 pu 0.1 pu 0.4 pu 0.2 pu 0.5 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage and current instantaneous values are given as 5 sin (ωt + 30°) pu and 2 sin (ωt - 15°) pu respectively. Find the per unit active power? 5 pu 7 pu 3.535 pu 5.353 pu 5 pu 7 pu 3.535 pu 5.353 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Area under the daily curve divided by 24 gives units generated average load maximum demand maximum load units generated average load maximum demand maximum load ANSWER DOWNLOAD EXAMIANS APP