Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 750 MW 500 MW 250 MW 1250 MW 750 MW 500 MW 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 25 MVA, 11 kV alternator is supplying full load at a point of 0.75 lagging. Determine the percentage increase in earning capacity when it is operated at improved power factor of 0.96 lagging. 56 %. 28 %. None of above 14 %. 56 %. 28 %. None of above 14 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are All of these Cost of electrical energy per KWh is to be minimum Reliable power has to be available Flexible power has to be available. All of these Cost of electrical energy per KWh is to be minimum Reliable power has to be available Flexible power has to be available. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draft tube is provided to increase the acting head on the water wheel. reduce the effect of water hammer. None of these raise the water surface of the stream to create an artificial head. increase the acting head on the water wheel. reduce the effect of water hammer. None of these raise the water surface of the stream to create an artificial head. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power station that does not requier any moving part is Solar power generation. Wind power generation. Thermonic convertor. Tidal power generation. Solar power generation. Wind power generation. Thermonic convertor. Tidal power generation. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an interconnected power system, the most suitable power plant to meet the peak load condition is thermal plant hydro power plant pumped storage plant nuclear plant thermal plant hydro power plant pumped storage plant nuclear plant ANSWER DOWNLOAD EXAMIANS APP