Power Systems
A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity?

 1250 MW
 750 MW
 500 MW
 250 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The draft tube is provided to

  increase the acting head on the water wheel.
 reduce the effect of water hammer.
None of these
 raise the water surface of the stream to create an artificial head.

ANSWER DOWNLOAD EXAMIANS APP