Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 750 MW 500 MW 1250 MW 250 MW 750 MW 500 MW 1250 MW 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Buchholz relay Differential relay Over current relay Over fluxing relay Buchholz relay Differential relay Over current relay Over fluxing relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line currents of 3-phase supply are: IR = 3 + j 5 A IY =2 + j 2 A IB = -2 - j 1 A The zero sequence current will be 1 + j 4 A 5 + j 7 A 1 + j 2 A -2 - j 1 A 1 + j 4 A 5 + j 7 A 1 + j 2 A -2 - j 1 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. operating cost is low and initial cost is high. both operating and initial cost are low. operating cost is high and initial cost is low. both operating and initial cost are high. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Highest pressure generating pump inside the thermal plant is boiler feed pump All of these low pressure heater high pressure heater boiler feed pump All of these low pressure heater high pressure heater ANSWER DOWNLOAD EXAMIANS APP
Power Systems To protect the power transformer ( Y-Y with neutral grounded) against fault, which type of connection do the current transformers have? Δ-Δ connection Y-Δ connection Y-Y connection Δ-Y connection Δ-Δ connection Y-Δ connection Y-Y connection Δ-Y connection ANSWER DOWNLOAD EXAMIANS APP