Process Equipment and Plant Design Most of the storage vessels/tanks are made cylindrical, because of the fact that a cylinder Both A & B Neither A nor B Is easy to fabricate Has greater structural strength Both A & B Neither A nor B Is easy to fabricate Has greater structural strength ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design 1.2 to 3.8 cms is the value of the Skirt clearance for bubble caps Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) Downcomer liquid seal in case of a balanced tray design All of these Skirt clearance for bubble caps Static submergence in case of a bubble cap tray for column operating under pressure (≥ 1 atm.) Downcomer liquid seal in case of a balanced tray design All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum tube pitch recommended for shell and tube heat exchangers is about __________ times the outside diameter of the tube. 1.75 1.25 3.5 2.5 1.75 1.25 3.5 2.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to 40% of the I.D. of the shell 25 cms 5 cms I.D. of the shell 40% of the I.D. of the shell 25 cms 5 cms I.D. of the shell ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Maximum allowable vapour velocity in a bubble cap tower is determined by the Diameter of the column None of these Vapour density Entrainment considerations Diameter of the column None of these Vapour density Entrainment considerations ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. 1-1 cocurrent All of these All multipass Double pipe 1-1 cocurrent All of these All multipass Double pipe ANSWER DOWNLOAD EXAMIANS APP