Process Equipment and Plant Design Brass valves are usually made for pipe sizes __________ inches. ?1 >2.5 >3.5 ?2 ?1 >2.5 >3.5 ?2 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Steam side heat transfer co-efficient for design consideration under ordinary condition can be assumed to be about __________ kcal/hr.m².°C. 2500 7500 15000 1250 2500 7500 15000 1250 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Movement of pipeline caused by thermal expansion is taken care by providing All of these Expansion joint Changes in its direction Change in the shape of pipeline All of these Expansion joint Changes in its direction Change in the shape of pipeline ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In case of 1.5" heat exchanger tubes, the inside flow area __________ with decrease in BWG. Increases Remains same None of these Decreases Increases Remains same None of these Decreases ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A forced circulation long tube vertical evaporator as compared to the natural circulation evaporator Employs a centrifugal pump placed between external downtake from vapor drum and inlet to tube bundle Is economical in operation Both B & C Employs high velocity, high heat transfer rate and less heating surface requirement Employs a centrifugal pump placed between external downtake from vapor drum and inlet to tube bundle Is economical in operation Both B & C Employs high velocity, high heat transfer rate and less heating surface requirement ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A rivetted joint does not fail by __________ of rivets. Tearing of the plate across a row None of these Tearing Shearing Tearing of the plate across a row None of these Tearing Shearing ANSWER DOWNLOAD EXAMIANS APP