Process Equipment and Plant Design In packed towers provided with saddle packing, liquid redistributors are positioned at every __________ times column diameter or 6 metres whichever is less. 43864 43959 20-25 44119 43864 43959 20-25 44119 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In distillation columns, bubble caps are held in place over trays by Both B and C Rivets Bolts A hold down bar Both B and C Rivets Bolts A hold down bar ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Factor of safety (i.e., overdesign factor) in heat transfer equipments is about __________ percent more than the actual/theoretical design factor. 15-20 30-35 35-40 43961 15-20 30-35 35-40 43961 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Holes of a sieve tray are arranged in triangular pitch of __________ times the hole diameter. 2.5 to 5 1.5 to 2 10 to 15 5 to 10 2.5 to 5 1.5 to 2 10 to 15 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Wall thickness of schedule 40 pipe as compared to that of schedule 80 pipe is Cither A or B; depends upon the I.D. of the pipe Same More Less Cither A or B; depends upon the I.D. of the pipe Same More Less ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of the distillation column. If sufficient slot area is not provided, the gas may pass through the skirt clearance Generally, a skirt clerance of 0.5" to 1.5' is recommended to prevent plugging of the slots by residue build up None of these The purpose of the slot is to disperse the gas into the liquid in the form of small bubbles If sufficient slot area is not provided, the gas may pass through the skirt clearance Generally, a skirt clerance of 0.5" to 1.5' is recommended to prevent plugging of the slots by residue build up None of these The purpose of the slot is to disperse the gas into the liquid in the form of small bubbles ANSWER DOWNLOAD EXAMIANS APP