Process Equipment and Plant Design Flanges are connected to pipes by All of these Welding Brazing Screwing All of these Welding Brazing Screwing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Generally, no corrosion allowance in wall thickness of a part is required, if the thickness is more than __________ mm. 20 30 10 5 20 30 10 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The slope of operating line in the rectifying section of a distillation column is unity, if the reflux ratio is 1 0 Minimum ∞ 1 0 Minimum ∞ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum baffle height should be Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter Twice the tank diameter 3/4 of the tank height Twice the impeller diameter Equal to the impeller diameter ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In perforated plate towers, the Hole sizes may be around 1/8" or 3/16" Total hole area may be around 6 to 15% of tower cross-sectional area All of these Pressure drop is less compared is similar bubble cap towers Hole sizes may be around 1/8" or 3/16" Total hole area may be around 6 to 15% of tower cross-sectional area All of these Pressure drop is less compared is similar bubble cap towers ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Typical static submergence for bubble cap plate column operating at atmospheric pressure may be around 2.5" 5" 50% of the plate spacing 0.5" 2.5" 5" 50% of the plate spacing 0.5" ANSWER DOWNLOAD EXAMIANS APP