Process Equipment and Plant Design LMTD correction factor is used in heat exchanger design for Double pipe heat exchanger Multipass shell and tube heat exchanger Counter flow of hot and cold fluids Fouling fluids Double pipe heat exchanger Multipass shell and tube heat exchanger Counter flow of hot and cold fluids Fouling fluids ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ strain is measured using a 'strain rosetter'. Linear Shear Volumetric None of these Linear Shear Volumetric None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid/petroleum fuel storage tanks are built underground (as in case of petrol pumps), when the storage capacity is less than __________ kilolitres. 20 30 85 45 20 30 85 45 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design __________ heat exchanger is also known as 'hair pin type' exchanger, Finned Regenerative Double pipe Plate type Finned Regenerative Double pipe Plate type ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of a horizontal tube evaporator. It is unsuitable for concentrating those liquids, which form a scale or deposit salt It is suitable for process, in which the final product is a liquor instead of solid Its usual dimensions are: tube dia = 2-3 cms; evaporator body dia = 1-4 metres and evaporator height = 2.5-4 metres Liquor flows inside the tube, while the steam is outside submerging the tube It is unsuitable for concentrating those liquids, which form a scale or deposit salt It is suitable for process, in which the final product is a liquor instead of solid Its usual dimensions are: tube dia = 2-3 cms; evaporator body dia = 1-4 metres and evaporator height = 2.5-4 metres Liquor flows inside the tube, while the steam is outside submerging the tube ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum tube pitch recommended for shell and tube heat exchangers is about __________ times the outside diameter of the tube. 2.5 1.75 3.5 1.25 2.5 1.75 3.5 1.25 ANSWER DOWNLOAD EXAMIANS APP