Process Equipment and Plant Design Minimum tube pitch recommended for shell and tube heat exchangers is about __________ times the outside diameter of the tube. 1.25 2.5 3.5 1.75 1.25 2.5 3.5 1.75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For laminar flow (NRe < 2100) in steel pipe, the optimum inside pipe diameter is given by Di, opt = 3 Q0.36 ρ0.18 Di, opt = 3.9 Q0.45 . ρ0.23 Di, opt = 3 Q0.36 . ρ1.86 μ0.08 Di, opt = 7.6 Q0.36 . ρ0.9 Di, opt = 3 Q0.36 ρ0.18 Di, opt = 3.9 Q0.45 . ρ0.23 Di, opt = 3 Q0.36 . ρ1.86 μ0.08 Di, opt = 7.6 Q0.36 . ρ0.9 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design To avoid the tearing off the plate of an edge, the margin (i.e., the minimum distance from the centre of the rivet hole to the nearest edge of the plate) should be equal to D 0.5 d 1.5 d 2.5 d D 0.5 d 1.5 d 2.5 d ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Normal screwed fittings are used for pipes upto a diameter of __________ inches. 3 1.5 7 5 3 1.5 7 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The most common standard size of bubble caps used in industrial operation is 8" dia cap with 1" dia riser 1" dia cap with 0.5" dia riser 4" dia cap with 8" dia riser 6" dia cap with 4" dia riser 8" dia cap with 1" dia riser 1" dia cap with 0.5" dia riser 4" dia cap with 8" dia riser 6" dia cap with 4" dia riser ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a distillation column, minimum clearance to be maintained betweeen the overflow weir and the last row of the bubble caps is __________ cms. 7.5 15 2.5 20 7.5 15 2.5 20 ANSWER DOWNLOAD EXAMIANS APP