Process Equipment and Plant Design Which of the following lengths of heat exchanger tubes are normally not used in practice? 2.5 metres 0.5 metre 6 metres 10 metres 2.5 metres 0.5 metre 6 metres 10 metres ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In packed absorption tower, onset of flooding usually occurs at a pressure drop of about __________ mm of water column per metre height of packing. 25-50 50-75 200-250 750-1000 25-50 50-75 200-250 750-1000 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a heat exchanger, shell side fluid velocity can be changed by changing the tube Pitch Layout Both A & B Neither A nor B Pitch Layout Both A & B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Reflux ratio variation in a distillation column is between Zero and one Zero and infinity Minimum and infinity None of these Zero and one Zero and infinity Minimum and infinity None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design With increase in the reflux ratio for a fixed production from a continuous binary distillation column, the __________ decreases. Running cost of cooling water for condenser Vapour & liquid load both Running cost of steam for reboiler Fixed charges initially Running cost of cooling water for condenser Vapour & liquid load both Running cost of steam for reboiler Fixed charges initially ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A minimum clearance of about __________ mm is maintained between the distillation column wall and the bubble cap. 95 76 38 19 95 76 38 19 ANSWER DOWNLOAD EXAMIANS APP