Process Equipment and Plant Design Hole diameter of the seive trays in the distillation column ranges from __________ mm. 12.5 to 18.5 3 to 12.5 4 to 8 L to 3 12.5 to 18.5 3 to 12.5 4 to 8 L to 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum baffle height should be Twice the tank diameter Twice the impeller diameter Equal to the impeller diameter 3/4 of the tank height Twice the tank diameter Twice the impeller diameter Equal to the impeller diameter 3/4 of the tank height ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design An adequate clearance between the tray and the shell wall of a distillation column is provided to Avoid back-trapping Allow for thermal expansion and facilitate installation None of these Drain the liquid from the tray when the unit is not in operation Avoid back-trapping Allow for thermal expansion and facilitate installation None of these Drain the liquid from the tray when the unit is not in operation ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The thickness of heat transfer plates used in the plate type heat exchanger ranges from __________ mm, pressed in a single piece provided with grooves & corrugations. 44055 3.5 to 7.0 1.25 to 3.125 0.3 to 0.8 44055 3.5 to 7.0 1.25 to 3.125 0.3 to 0.8 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A/an __________ is used for changing the direction of a pipeline. Flange Elbow Disc compensator Union Flange Elbow Disc compensator Union ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design What is the minimum recommended ligament for square pitch arrangement in case of heat exchangers? 6.5 mm Equal to tube O.D Equal to tube I.D 6.5 cms 6.5 mm Equal to tube O.D Equal to tube I.D 6.5 cms ANSWER DOWNLOAD EXAMIANS APP