Process Equipment and Plant Design For storing hazardous chemicals in large storage tanks, the minimum safe distance between the two tanks should range between __________ times the tank diameter. 1 to 1.5 6 to 8 2.5 to 3.5 4 to 5 1 to 1.5 6 to 8 2.5 to 3.5 4 to 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to 40% of the I.D. of the shell 5 cms I.D. of the shell 25 cms 40% of the I.D. of the shell 5 cms I.D. of the shell 25 cms ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 0.5 to 1.5 2.5 to 4.0 10 to 15 5 to 10 0.5 to 1.5 2.5 to 4.0 10 to 15 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Generally, as the length of the liquid path on a tray is increased beyond 5 ft, the overall column efficiency Decreases Increases Remains same May increase or decrease depending upon the plate spacing Decreases Increases Remains same May increase or decrease depending upon the plate spacing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Multiple blade paddle agitator is used for mixing high viscosity liquids/paste in which the paddle diameter is commonly 0.8 times the tank diameter. However, the width of the blade is in the range of __________ times the paddle diameter. 0.1 to 0.25 0.5 to 0.6 0.65 to 0.80 0.3 to 0.5 0.1 to 0.25 0.5 to 0.6 0.65 to 0.80 0.3 to 0.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following lengths of heat exchanger tubes are normally not used in practice? 0.5 metre 6 metres 2.5 metres 10 metres 0.5 metre 6 metres 2.5 metres 10 metres ANSWER DOWNLOAD EXAMIANS APP