Airport Engineering
In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be

32
36
68
44

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
In instrument landing system

L.O.M. and L.M.M. are installed on one side and Localizer antenna on the other side
Localizer and L.M.M. are installed on one side and L.O.M. on the other side
None of these
L.O.M. and Localizer are installed on one side and L.M.M. on the other side

ANSWER DOWNLOAD EXAMIANS APP