Airport Engineering
In an airport, if 4 groups of 5 gates each located well separated are considered for traffic and the future to present traffic ratio is 3, then the total requirement of future gates will be

36
44
68
32

ANSWER DOWNLOAD EXAMIANS APP

Airport Engineering
The capacity of parallel runway pattern depends upon

Lateral spacing between two runways and weather conditions
Weather conditions and navigational aids available
Lateral spacing between two runways and navigational aids available
Lateral spacing between two runways, weather conditions and navigational aids available.

ANSWER DOWNLOAD EXAMIANS APP