Process Equipment and Plant Design

Process Equipment and Plant Design
In a multipass shell and tube heat exchanger, the shell side cross flow area does not depend upon

Pitch
Clearance
Baffle spacing
None of these

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
The maximum liquid gradient over a tray must not exceed

0.5" -1.25"
2"-3.5"
Half the tray spacing
5"

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
In the allocated cap area, bubble caps are generally arranged on equilateral triangular pitch. Number of caps fixed on a plate is with a

Cap pitch of 1.3-2 times the cap diameter
Either A or B
Neither A nor B
Clearance of 25-75 mm

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Safety valves are provided in chemical equipments to guard against excessive

Temperature
Turbulence
Noise
Pressure/pressure fluctuation

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Typical static submergence for bubble cap plate column operating at atmospheric pressure may be around

5"
0.5"
50% of the plate spacing
2.5"

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
The distance between the centre of a rivet hole to the nearest edge of the plate is called

Pitch
Margin
None of these
Back pitch

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Process Equipment and Plant Design

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑