Process Equipment and Plant Design In packed absorption tower, onset of flooding usually occurs at a pressure drop of about __________ mm of water column per metre height of packing. 200-250 750-1000 25-50 50-75 200-250 750-1000 25-50 50-75 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Floating head heat exchangers are used for the Counter-current heat transfer systems Heat transfer between corrosive fluids Co-current heat transfer systems Cases where temperature difference between the shell and the tubes is more (>50°C) Counter-current heat transfer systems Heat transfer between corrosive fluids Co-current heat transfer systems Cases where temperature difference between the shell and the tubes is more (>50°C) ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The LMTD correction factor (FT) is applied in __________ heat exchangers. Double pipe All multipass All of these 1-1 cocurrent Double pipe All multipass All of these 1-1 cocurrent ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The ideal size of round bubble caps to be used in industrial distillation column having a diameter of 3-6 metres is __________ cms. 7.5 50 15 5 7.5 50 15 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to I.D. of the shell 5 cms 40% of the I.D. of the shell 25 cms I.D. of the shell 5 cms 40% of the I.D. of the shell 25 cms ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a distillation column, minimum clearance to be maintained betweeen the overflow weir and the last row of the bubble caps is __________ cms. 2.5 15 20 7.5 2.5 15 20 7.5 ANSWER DOWNLOAD EXAMIANS APP