Process Equipment and Plant Design In the agitators, the power required will be changed with the increase of diameter of agitator (D) as D⁵ D⁹ D D² D⁵ D⁹ D D² ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Friction factor for turbulent flow in a new pipe is given by f = 0.04/NRe0.16 f = 0.22 NRe0.05 f = 16/NRe f = 25/NRe f = 0.04/NRe0.16 f = 0.22 NRe0.05 f = 16/NRe f = 25/NRe ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Ratio of tube length to shell diameter for a shell and tube heat exchanger is 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers Both B & C < 4 : 1 for gas-gas exchangers 4 : 1 to 8 : 1 for liquid-liquid exchanger 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers Both B & C < 4 : 1 for gas-gas exchangers 4 : 1 to 8 : 1 for liquid-liquid exchanger ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following lengths of heat exchanger tubes are normally not used in practice? 0.5 metre 6 metres 10 metres 2.5 metres 0.5 metre 6 metres 10 metres 2.5 metres ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In condenser, the cooling water is passed in the tube side in a pass arrangement, because It makes condenser compact Pressure drop is reduced More thinner tubes can be used It reduces heat transfer area It makes condenser compact Pressure drop is reduced More thinner tubes can be used It reduces heat transfer area ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For a given design of bubble cap, the number of bubble caps to be used per tray is set by the Plate spacing Diameter of the column Allowable gas velocity through the slots All of these Plate spacing Diameter of the column Allowable gas velocity through the slots All of these ANSWER DOWNLOAD EXAMIANS APP