Process Equipment and Plant Design
Corrosion allowance in the design of pressure vessel/chemical equipment is not necessary, if

Both B & C
Material of construction is high alloy steel
Plain carbon steel and cast iron parts are used
Wall thickness is > 30 mm

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
A forced circulation long tube vertical evaporator as compared to the natural circulation evaporator

Employs high velocity, high heat transfer rate and less heating surface requirement
Both B & C
Employs a centrifugal pump placed between external downtake from vapor drum and inlet to tube bundle
Is economical in operation

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Pick out the wrong statement about routing of fluids in a shell and tube heat exchanger.

The corrosive and fouling fluid should be preferably routed through the tubes
Lower flow rate fluid should be routed through the shell side
The viscous fluid should be routed through the shell side
Higher pressure fluid stream should be routed through the shell side

ANSWER DOWNLOAD EXAMIANS APP