Airport Engineering If lift off distance of an craft is 2000 m, the clear way at the end of the runway should not be less than 145 m 162.5 m 152.5 m 172.5 m 145 m 162.5 m 152.5 m 172.5 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Assertion A : The ratio of arriving and departing aircrafts influences the airport capacity: Reason R : Landing operation is generally given priority over the taking off operation. Select your answer based on the coding system given below: Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R is true and R is not the correct explanation of A Both A and R is true and R is the correct explanation of A A is true but R is false A is false but R is true ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering In approach areas of runways equipped with instrumental landing facilities any object within 4.5 km distance from runway end shall be considered as an obstruction if its height is more than 51 m 20 m 45 m 30 m 51 m 20 m 45 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Airport elevation is the reduced level above M.S.L. of Highest point of the landing area Control tower None of these Lowest point of the landing area Highest point of the landing area Control tower None of these Lowest point of the landing area ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The main disadvantage of angle nose out parking configuration of aircraft is that the Hot blast is directed towards the terminal building Aircraft rear loading door is far away from terminal building Overall apron area required is more All listed here Hot blast is directed towards the terminal building Aircraft rear loading door is far away from terminal building Overall apron area required is more All listed here ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The size of landing area for multi engine helicopters operating under 1 FR conditions is 60 m × 120 m 30 m × 30 m 22.5 m × 30 m 22.5 m × 22.5 m 60 m × 120 m 30 m × 30 m 22.5 m × 30 m 22.5 m × 22.5 m ANSWER DOWNLOAD EXAMIANS APP