Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 10 cubic meter 8 cubic meter 12 cubic meter 15 cubic meter 10 cubic meter 8 cubic meter 12 cubic meter 15 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is gasoline heavy diesel light diesel kerosene oil gasoline heavy diesel light diesel kerosene oil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Length of a vehicle affects width of traffic lanes clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities width of traffic lanes clearance to be provided under structures such as overbridges, under-bridges etc. extra width of pavement and minimum turning radius width of shoulders and parking facilities ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Reaction time of a driver is same for all speeds increases with increase in speed None of these decreases with increase in speed is same for all speeds increases with increase in speed None of these decreases with increase in speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a informatory sign None of these warning sign regulatory sign informatory sign None of these warning sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP