Process Equipment and Plant Design Hazards associated with the relief valve leakage for extremely hazardous material storage can be taken care of by providing Rupture diaphragm Dikes Surge chamber None of these Rupture diaphragm Dikes Surge chamber None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger having square pitch, the shell side equivalent diameter is given by (where, P = pitch, d = outside diameter of the tube) (P² - πd²/4)/πd Πd/4P² 4(P² - πd²/4)/πd 4P²/πd (P² - πd²/4)/πd Πd/4P² 4(P² - πd²/4)/πd 4P²/πd ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a distillation column, bubble caps are located on trays with a pitch of __________ times the outside diameter of the caps. 2.5 1.6 to 2 1.3 to 2 1.5 to 3 2.5 1.6 to 2 1.3 to 2 1.5 to 3 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design What is the value of 'q' for saturated vapor feed to a distillation column ?(where q = fraction of the feed stream that is liquid.) 1 > 1 1 > 1 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Diameter of the seive tray column is determined by the Upper limit of the vapour velocity Hole diameter of the seive tray Lower limit of vapour velocity Height of the plate spacing Upper limit of the vapour velocity Hole diameter of the seive tray Lower limit of vapour velocity Height of the plate spacing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following factors affect the pressure drop in a co-current gas-liquid absorption packed tower? Size, shape, orientation and surface of the packing particles All of these Density and viscosity of fluids Fluid flow rates Size, shape, orientation and surface of the packing particles All of these Density and viscosity of fluids Fluid flow rates ANSWER DOWNLOAD EXAMIANS APP