Construction Planning and Management

Construction Planning and Management
For the network shown in the given figure, the expected time for the activity

3-4 is 8
1-2 is 4
2-3 is 7
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
A CPM family includes

All listed here
CPP (Critical Path Plotted)
MCE (Minimum Cost Expenditure)
CPA (Critical Path Analysis)

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as

Interfering float
Free float
Independent float
Total float

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
If a is the optimistic time, b is the pessimistic time and m is most likely time of an activity, the expected time of the activity, is

(a + 2m + b)/6
(a + 4m + b)/6
(a + 5m + b)/6
(a + m + b)/6

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
The basic action involved in sheep foot rolling is

Vibration
Pressing
Kneading
Tamping

ANSWER DOWNLOAD EXAMIANS APP

Construction Planning and Management
The time which results in the least possible construction cost of an activity, is known as

Crash time
Slow time
Normal time
Standard time

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Construction Planning and Management

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑