Airport Engineering Calm period is the percentage of time during which wind intensity is less than 9.6 kmph 8.0 kmph 6.4 kmph 4.8 kmph 9.6 kmph 8.0 kmph 6.4 kmph 4.8 kmph ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The width and interval of transverse centre line bars along the extended centre line of runway, in approach lighting system are 3 m and 45 m 4.2 m and 30 m 3 m and 30 m 4.2 m and 50 m 3 m and 45 m 4.2 m and 30 m 3 m and 30 m 4.2 m and 50 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering To cope up high temperature of 196°C, the taxi ways and aprons are constructed with Rubberised tar concrete Asphaltic concrete Plain concrete All listed here Rubberised tar concrete Asphaltic concrete Plain concrete All listed here ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Which of the following factors are taken into account for estimating the runway length required for aircraft landing?1. Normal maximum temperature2. Airport elevation3. Maximum landing weight4. Effective runway gradientSelect the correct answer using the codes given below Codes: 1,2 and 4 1,2,3 and 4 1,3, and 4 2 and 3 1,2 and 4 1,2,3 and 4 1,3, and 4 2 and 3 ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering If the monthly mean of average daily temperature for the hottest month of the year is 25°C and the monthly mean of the maximum daily temperature of the same month of the year is 46°C, the airport reference temperature is 48°C 25°C 35.5°C 32°C 48°C 25°C 35.5°C 32°C ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering According to I.C.A.O. all markings on the runways are painted white and on taxiways Red Yellow Green Black Red Yellow Green Black ANSWER DOWNLOAD EXAMIANS APP