For constructing a terrazzo floor, Pick up the incorrect statement from the following:

Glass strips are driven into the layer according to the pattern required
A 32 mm thick layer of cement concrete (1 : 2 : 4) is laid on the base course and the surface is made smooth by trowelling
After final grinding is over, oxalic acid mixed with water is spread over and rubbed hard with soft material
A base course is prepared as in cement concrete flooring

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Pick up the correct statements from the following:

Excessive thermal variations in the backing or plaster causes the plaster to fall
All listed here
In brick work, the efflorescence is removed by applying a solution of zinc sulphate and water
Cracks appear on the plastered surface in the form of hair cracks