Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 20 m 15 m 10 m 5 m 20 m 15 m 10 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction For a wall carrying heavy load on low bearing capacity soil, Lean concrete bed is provided Reinforced concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above Lean concrete bed is provided Reinforced concrete bed is provided Thick concrete bed is provided Both (A) and (C) of the above ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of working a flat for the finishing coat, is known Blistering Floating Knitting Dubbing out Blistering Floating Knitting Dubbing out ANSWER DOWNLOAD EXAMIANS APP
Building Construction In flat roof of reinforced cement concrete, the recommended angle of slope, is 10° Zero 200° A few degrees 10° Zero 200° A few degrees ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone whose crushing strength is least, is Granite Marble Chalk Slate Granite Marble Chalk Slate ANSWER DOWNLOAD EXAMIANS APP