Building Construction The depth of the ground water table may be ascertained by Standing on the well in the vicinity Looking through the well in the vicinity None of these Measuring the depth of water in the well Standing on the well in the vicinity Looking through the well in the vicinity None of these Measuring the depth of water in the well ANSWER DOWNLOAD EXAMIANS APP
Building Construction Auger boring All of these Is the most primitive method for making a hole in the ground Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table All of these Is the most primitive method for making a hole in the ground Is most economical up-to a depth of 5 meters Is generally employed in cohesive and other self soils above water table ANSWER DOWNLOAD EXAMIANS APP
Building Construction The black cotton soil Swells excessively when wet Shrinks excessively when dry Undergoes volumetric changes All of these Swells excessively when wet Shrinks excessively when dry Undergoes volumetric changes All of these ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form Work including the props can be removed from beams, only after 7 days 14 days 21 days 3 days 7 days 14 days 21 days 3 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil, may be improved by Grouting Compaction Drainage Chemical action Grouting Compaction Drainage Chemical action ANSWER DOWNLOAD EXAMIANS APP