Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 5 4 6 3 5 4 6 3 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soils possessing low bearing capacity, the type of foundation generally provided, is All of these Column footing Raft footing Grillage footing All of these Column footing Raft footing Grillage footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 25 to 50 mm 25 to 75 mm 30 to 125 mm 50 to 100 mm 25 to 50 mm 25 to 75 mm 30 to 125 mm 50 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Grouting Draining the soil Increasing the depth of foundation Compacting the soil Grouting Draining the soil Increasing the depth of foundation Compacting the soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Sound insulation Prevention of dampness Heat insulation All of these Sound insulation Prevention of dampness Heat insulation All of these ANSWER DOWNLOAD EXAMIANS APP