Building Construction If the depth of an excavation is 20 meters, number of single stage well points to be installed at various levels, is 6 5 3 4 6 5 3 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soils possessing low bearing capacity, the type of foundation generally provided, is Raft footing Column footing All of these Grillage footing Raft footing Column footing All of these Grillage footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for beams and slabs; is 30 to 125 mm 50 to 100 mm 25 to 75 mm 25 to 50 mm 30 to 125 mm 50 to 100 mm 25 to 75 mm 25 to 50 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of a water logged soil can be improved by Draining the soil Grouting Compacting the soil Increasing the depth of foundation Draining the soil Grouting Compacting the soil Increasing the depth of foundation ANSWER DOWNLOAD EXAMIANS APP
Building Construction Cavity wall is generally provided for Heat insulation Sound insulation All of these Prevention of dampness Heat insulation Sound insulation All of these Prevention of dampness ANSWER DOWNLOAD EXAMIANS APP