Railway Engineering Anti creep bearing plates are provided on bridges and approaches None of these joints both (A) and (B) bridges and approaches None of these joints both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Yellow lighthand signal indicates proceed None of these proceed cautiously stop proceed None of these proceed cautiously stop ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal is i) outer signal ii) home signal iii) starter iv) advanced starter The correct answer is (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) (iii) and (iv) (i) and (ii) (ii) and (iii) (i)and(iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 4-8-2 locomotive. The number of driving wheels in this locomotive is 8 16 4 12 8 16 4 12 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The limiting value of cant deficiency for Meter Gauge routes is 50 mm 100 mm 40 mm 75 mm 50 mm 100 mm 40 mm 75 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The compensation for curvature on gradient for Meter Gauge is given by (where R is radius of curve.) 52.5/R 105/R 70/R 35/R 52.5/R 105/R 70/R 35/R ANSWER DOWNLOAD EXAMIANS APP