Railway Engineering Anti creep bearing plates are provided on bridges and approaches None of these both (A) and (B) joints bridges and approaches None of these both (A) and (B) joints ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following statements : Automatic signaling system results in1. greater risk2. higher efficiency3. avoidance of block instruments4. higher operating cost of these statements 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct 1 and 4 are correct 2 and 3 are correct I and 2 are correct 3 and 4 are correct ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The height of the rail for 52 kg rail section is 189 mm 162 mm 187 mm 156 mm 189 mm 162 mm 187 mm 156 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a Broad Gauge route with M+7 sleeper density, number of sleepers per rail length is 19 21 18 20 19 21 18 20 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Switch angle depends on i) heel divergence ii) length of tongue rail iii) flangeway clearance iv) throw of switch The correct answer is (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) (i)and(iv) (i) and (ii) (iii) and (iv) (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP