Railway Engineering Anti creep bearing plates are provided on joints both (A) and (B) bridges and approaches None of these joints both (A) and (B) bridges and approaches None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of switches provided on a Gaunt-letted track is 1 3 2 None of these 1 3 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The object of providing a point lock is to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail None of these to ensure that each switch is correctly set to ensure that the point may not be operated while the train is on it to detect any obstruction between and tongue rail None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The slipping of driving wheels of locomotives on the rail surface causes scabbing of rails wheel burns corrugation of rails hogging of rails scabbing of rails wheel burns corrugation of rails hogging of rails ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Metal sleepers are superior to wooden sleepers with respect to cost life track circuiting fastening cost life track circuiting fastening ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Flange-way clearance is the distance Through which the tongue rail moves laterally at the toe of the switch Between the gauge faces of the stock rail and the tongue rail None of these Between the adjoining faces of the running rail and the check rail near the crossing Through which the tongue rail moves laterally at the toe of the switch Between the gauge faces of the stock rail and the tongue rail None of these Between the adjoining faces of the running rail and the check rail near the crossing ANSWER DOWNLOAD EXAMIANS APP