Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 1,3,4,2 1,3,2,4 3,1,4,2 3,1,2,4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The treadle bar is provided near and parallel to inner side of one of the rails near and parallel to inner side of both the rails at right angle to the rail in the middle of the track a little in front of the toes of the tongue rail near and parallel to inner side of one of the rails near and parallel to inner side of both the rails at right angle to the rail in the middle of the track a little in front of the toes of the tongue rail ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering When the rail ends rest on a joint sleeper, the joint is termed as supported rail joint suspended rail joint base joint bridge joint supported rail joint suspended rail joint base joint bridge joint ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The reception signal isi) outer signalii) home signaliii) starteriv) advanced starter The correct answer is (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) (i)and(iv) (ii) and (iii) (i) and (ii) (iii) and (iv) ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Which of the following mechanical devices is used to ensure that route cannot be changed while the train is on the point even after putting back the signal ? stretcher bar point lock detectors iock bar stretcher bar point lock detectors iock bar ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 5 4 2 6 5 4 2 6 ANSWER DOWNLOAD EXAMIANS APP