Railway Engineering Minimum composite sleeper index pres-cried on Indian Railways for a track sleeper is 1353 552 783 1588 1353 552 783 1588 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of cotters used in CST-9 sleepers is 5 2 3 4 5 2 3 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys. 1. Reconnaissance survey 2. Preliminary survey 3. Traffic survey 4. Location survey The correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering In a B.G. railway track, the specified ruling gradent is 1 in 250. The horizontal curve of 3° on a gradient of 1 in 250 will have the permissible gradient of 1 in 257 1 in 357 1 in 457 1 in 512 1 in 257 1 in 357 1 in 457 1 in 512 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm 7.768 cm -0.168 cm 0.168 cm 7.432 cm 7.768 cm -0.168 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The desirable rate of change of cant deficiency in case of Metre Gauge is 65 mm/sec 55 mm/sec 20 mm/sec 35 mm/sec 65 mm/sec 55 mm/sec 20 mm/sec 35 mm/sec ANSWER DOWNLOAD EXAMIANS APP